Source review: 26 October 2026. Recheck law, guidance and commercial facts before relying on them.

General screening only. This does not establish eligibility, replace engineering or legal advice, or predict a financing decision. Entries remain in this page; nothing is transmitted or saved automatically. Print to retain your completed record.

Define the actual project

01 / Feedstock

Representative composition and seasonal sampling; moisture, size, ash, halogens and metals where relevant; mass-balance basis; specification and supply remedies.

Evidence status

02 / Integrated operation

Connected-system record for relevant feed and product; all outages and recoveries; maintenance and consumable changes; independently checkable results.

Evidence status

03 / Product and buyer

Written product limits and analytical methods; relevant continuous results; interface guarantees; delivery, pricing and rejection rights.

Evidence status

04 / Residues and permissions

All solid, liquid and gas outlets; legal handling and approval requirements; disposal or sales contracts; off-spec and shutdown arrangements.

Evidence status

05 / Downside economics

Accepted annual output; preparation losses; availability; gate-fee conditions; utilities and capital burden; policy value separately evidenced.

Evidence status

Availability sensitivity

Hypothetical only. Hold operating rate, accepted yield and annual fixed costs unchanged. This isolates fixed cost per accepted unit, not total fuel cost.

Your decision

Choose one action; do not average away a failed gate

Primary sources and limits

Document dates differ from access and effective dates. Canada PDF currency: 30 September 2026. EU consolidated directive examined: 16 July 2024. IRS February 2026 announcement: proposed rules. Argonne 2011 and Task 33 2025 are dated studies, not 2026 certificates for individual plants.

A1: Bankable's original screening judgment. A2: the explicitly hypothetical availability calculation.

October source update: Canada consolidation current to 30 September 2026, last amended 30 September 2024. IRS Notice 2026-53 supplies the 2026 emissions-rate table and additional guidance; the February announcement discussed proposed regulations. Determine the applicable current text for the actual fuel and production year.